Gesamtlänge aller Episoden: 13 days 4 hours 29 minutes
Toward the end of January 1967, it was revealed that Lunar Module 1 would not reach the Cape in February, as expected. This meant, the moon landing might be delayed because the lander was not ready. But the mission planners … Continue reading →
The Pegasus satellite was named for the winged horse of Greek mythology. Like its namesake, the Pegasus was notable for its “wings”, a pair of 29 meter long, 4.3 meter wide arrays of 104 panels fitted with sensors to detect punctures … Continue reading →
The key to high-energy stages was to use liquid hydrogen as the fuel. Liquid hydrogen fuel appealed to rocket designers because of its high specific impulse, which is a basic measure of rocket performance.
At various stages of lunar module design, mockup reviews were conducted to demonstrate progress and identify weaknesses. These inspections were formal occasions, with a board composed of NASA and contractor officials and presided over by a chairman fro...
Over 52 years ago, in the early hours of May 5th, 1961 the US prepared to launch its first man into space. Three weeks earlier, the Soviet Union had sent Yuri Gagarin on an orbital mission. This was a suborbital … Continue reading →
The Lunar Lander originally had two docking hatches, one at the top center of the cabin and another in the forward position, or nose, of the vehicle, with a tunnel in each location to permit astronauts to crawl from one … Continue reading →